raised loft flooring
Step 1
Clear work area
You only need to clear an area 1.2m x 1.2m, by placing any items already in the loft to one side. There's no need to remove items from the loft.

Now insulate between the joists, if it's not already done.
Step 2
Arrange supports
Align supports along joists, avoiding obsticles, and spacing them 610 mm apart.

Screw the supports into the joists, through two pre-drilled holes.
Step 3
Slide on the steel beams
Slide steel beams onto supports and secure through the pre-drilled holes and slots
Step 4
Top-up insulation
Roll top-up insulation between supports
Step 5
Secure deck
Secure deck using standard loft boards